L5VAULT / F-06

Home / Platform / Risk Register

Risk RegisterA risk register that stays alive after the audit.

Capture risks with likelihood, impact, owners, treatments and review dates. Link each risk to the controls that reduce it, so residual risk moves when evidence does.

risk-register31 open / 6 high
IDRiskL x IOwnerTreatmentReview
R-012Leaver access not revoked same day4 x 4 = 16Head of ITHRMS-triggered deprovisioning15 Jan
R-019Production database in a single region3 x 5 = 15CTOCross-region replica30 Jan
R-007Invoice fraud via phishing of finance staff4 x 3 = 12CFOSimulated phishing, payee checks12 Feb
R-023Personal data shared with vendor without DPA3 x 4 = 12ProcurementBlock onboarding without DPA20 Dec
R-031Unencrypted laptop lost in transit2 x 3 = 6IT OpsMDM disk encryption05 Mar

HOW IT WORKS

Four steps, then it runs on its own.

  1. 01

    Identify

    Start from a library of common risks for your sector or add your own.

  2. 02

    Score

    Rate likelihood and impact on a 5 by 5 matrix for inherent and residual risk.

  3. 03

    Treat

    Choose to mitigate, transfer, avoid or accept, with an owner and target date.

  4. 04

    Review

    Scheduled reviews keep the register current. Management review packs export in one click.

CAPABILITIES

What Risk Register does for you.

5 by 5 matrix

Heat map for inherent and residual risk, filterable by owner, asset or entity.

Linked to controls

When a linked control fails, the residual risk is flagged for review.

Clear ownership

Each risk has an owner and treatment owner with reminders before due dates.

Risk acceptance

Formal acceptance with approver, rationale and expiry date.

Asset inventory

Link risks to assets and data categories, including personal data under DPDP.

Management review

Export the register and treatment status for leadership and board reviews.

IN DETAIL

What auditors look for

A defined method

ISO 27001 clause 6.1.2 expects a repeatable risk assessment method with acceptance criteria.

Treatment plans

Clause 6.1.3 links treatment to controls and the Statement of Applicability.

Regular review

Risks reviewed at planned intervals and when significant changes occur.

QUESTIONS

About Risk Register

Can we import our current register?
Yes. Import from a spreadsheet and keep your existing IDs.
Can we change the scoring scale?
Yes. Configure scales and acceptance thresholds to match your method.
Is it only for ISO 27001?
No. The same register supports SOC 2 risk assessment and DPDP privacy risks.

L6 / DATA CORE

Seal the core.

Connect up to three tools and see exactly where you stand against one framework. Free, read-only, and live in about fifteen minutes.

Start readiness check free

Prefer to walk through scope first? Contact us